Outside the forge: the yard, the red roof, the doors
Inside the forge has had most of the attention. On 1 October the outside caught up in a single day.
Red doors, and three horseshoes
The new French doors in the stone wall have red frames, still under their blue protective film in these photographs. Above them, set into the render, are three horseshoes. The ground in front had been mud and a cement mixer on 28 September. By the 30th it was graded to gravel, ready for the pour.
A yard poured, then stamped
The slab went down on the 1st and was floated smooth by dusk, with the forge doorway glowing orange at the left. The crew worked on after dark under a floodlight, pressing a stone pattern into the concrete while it was still workable, then a cobble border around the edge.
A roof off at lunchtime, a red one on by evening
While the yard was being poured, the small outbuilding next to the cottage lost its roof. By about one o’clock it was down to the rafters, with the red corrugated sheets waiting on the gravel. By six it had them on.
It is a small building and a small roof, but red on that white wall is a bright thing to come home to.
The cottages above Mulroy Bay are open while the forge takes shape. Come and see the place for yourself.