Davey John’s Forge · Journal

The forge is waking up again

Major work has started on the old blacksmith's forge, and we're excited to show you where it's going.

This is a day I've been looking forward to for a long time. Work has finally started on the forge itself, the hearth end of the old forge building where DJ worked and the part that gives Davey John's Forge its name. Today the crew knocked out a new door opening and cleared the old window reveals so we can take proper measurements for what will be two new windows and a set of double doors.

It's a working site right now, no question about that. There's rubble on the floor, wheelbarrows everywhere, and a digger arriving tomorrow to dig out the old floor entirely. But even in this state, the bones of the place are remarkable. The stone hearth and chimney arch are solid, and the old ironwork machinery is still fixed to the back wall where DJ left it.

Interior of the forge looking toward the stone hearth and chimney arch, with rusted iron machinery and a wooden workbench along the back wall, exposed timber roof trusses above, a bare bulb hanging on a wire, and a wheelbarrow and shovel in the foreground.
The hearth and its chimney arch, still standing. The old ironwork on the back wall will stay.
The work

A new door, two new windows, and a clean floor

Today's job was knocking out the new door opening and getting the window reveals cleared so we can measure up properly. Once the digger has been in tomorrow and the old floor is out, we'll be laying a new one from scratch, and then the real work begins: cleaning back the walls, pointing the stonework, and getting the old furnace area ready for the new stove that's going in there.

The plan is to keep as much of the original fabric as we can. The stone walls, the hearth structure, the roof trusses — they've lasted this long and they'll last a good while longer once they're properly looked after. We're building around what DJ left behind, not over it.

Exterior view of the forge building mid-clearance, showing the open front with no door, a corrugated metal roof, a whitewashed rendered pier to the right of the opening, two wheelbarrows inside, rubble and dug earth in the foreground, and a whitewashed building to the left.
The new door opening, knocked out and ready to be measured up.
Inside the walls

What the old windows looked out on

Walking around inside before the digger arrives, I took a moment to look through the existing window openings. One looks out over fields and open sky toward the hills; another looks out toward the yard where the rest of the site sits. Once the new windows are in and glazed, these will be proper views again rather than just gaps in the stonework.

There's something about standing inside a building like this and seeing daylight come through a window that's been there for generations. We'll be keeping those proportions. The new windows will sit in the same openings.

View from inside the dark interior of the forge looking out through an unglazed stone window opening, with green fields, hedgerows, and overcast sky visible beyond, a black pipe running across the sill, and rough stonework forming the reveal on all sides.
Looking out through one of the old window openings toward the fields beyond.
The crew

Getting the rubble shifted out

Clearing a floor like this is proper graft. Two of the crew worked through the day moving rubble, with wheelbarrows going back and forth and shovels scraping down to the old earth beneath. Once the digger finishes tomorrow and the new concrete floor goes in, the space will feel completely different — bigger, cleaner, and ready for the next phase.

It was good to see the place getting cleared out properly for the first time in a long while. Every barrow-load out the door brings it a step closer to what it's going to become.

Two workers inside the forge shovelling rubble and debris near a broken-out doorway opening, with exposed dark timber ceiling beams above, a rough stone pillar in the foreground, a whitewashed building and window visible outside, and a pile of broken masonry on the ground.
The crew clearing rubble from the forge floor after the new opening was knocked through.
The hearth

Where the new stove will sit

The old furnace area at the back of the forge is where the new stove will go. The stone hearth block is in solid enough shape that it can be worked around, and the chimney arch above it is intact. Once the walls are cleaned back and pointed and the stove is in, that whole end of the building will be the heart of the room again, which feels right.

We haven't finalised every detail yet, but the direction is clear: a space that honours what was here, made properly useful for what comes next.

Interior of the forge with a person bent over picking up rubble near two wheelbarrows, the stone hearth and chimney arch visible in the background, rusted ironwork on the back wall, exposed timber roof trusses above, and a small window opening letting in light from the left.
The hearth area at the back of the forge, where the new stove will eventually sit.
Stay with us

While the forge takes shape, the cottages above Mulroy Bay are open and ready — come and see the place for yourself.